[资料] 深圳西部通道填海及地基处理工程施工组织设计

深圳西部通道填海及地基处理工程施工组织设计

深圳西部通道填海及地基处理工程施工组织设计
目    录

一、施工组织设计··················································1
1 编制依据······················································1
2 工程概况······················································2
3 施工部署······················································5
4 本工程的关键工序及采取的相应技术措施··························7
5 主要工程项目的施工方案、施工方法······························8
5.1场地平整、清理············································8
5.2隔堤强夯挤淤··············································8
5.3伏堤振冲碎石桩施工········································9
5.4土工布铺设···············································10
5.5 砂垫层施工··············································10
5.6 盲沟、集水井施工········································10
5.7 塑料插板施工············································11
5.8 底基层填筑··············································12
5.9 堆载施工················································13
5.10 施工质量监测···········································13
6 拟投入的主要施工机械设备、劳动力进场计划·····················14
7 施工进度计划·················································15
8 施工总平面规划···············································16
9 确保工程质量的技术组织措施···································17
附图表一:质量检查组织机构图·································22
附图表二:用于质检的仪器、设备表·····························23
附图表三:质量保证体系框图···································24
10 确保安全生产的技术组织措施··································25
11 确保文明施工的技术组织措施··································27
12 确保工期的技术组织措施······································28
13 雨季施工技术措施············································29
14 环境保护技术组织措施········································30
15 地上地下设施的保护加固措施··································30
16 服从业主、监理工程师全过程管理保证措施······················31
表8.1 拟投入的主要施工机械设备表······························32
表8.2 劳动力计划表············································33
表8.3 计划开、竣工日期和施工进度网络图························34
表8.4 施工总平面布置图及临时用地表····························36
二、项目管理班子配备情况·······································37
表8.5 项目管理班子配备情况表··································37
表8.6 项目经理简历表··········································38
表8.7 项目技术负责人简历表····································40
表8.8 项目管理班子配备情况辅助说明资料························41
三、项目拟分包情况··············································67
表8.9 项目拟分包情况表········································67
附件: 您所在的用户组无法下载或查看附件
本帖最近评分记录
  • wyb12345 华族币 +8 加分奖励 2006-8-15 22:51

TOP

很不错 谢谢楼主的无私奉献!!!

TOP

谢谢楼主的资料!

TOP

顶顶!!!!!!!!!!
好东西
本帖最近评分记录
  • wyb12345 华族币 -2 请勿灌水 2006-8-19 19:38

TOP

顶顶!!!!!!!!!!
好东西
本帖最近评分记录
  • wyb12345 华族币 -2 请勿灌水 2006-8-19 19:38

TOP

是个不错的施工组织设计,支持中!!!

TOP

本帖最近评分记录
  • wyb12345 华族币 -6 请勿灌水 2006-8-19 19:38

TOP

感谢楼主上传如此齐全的资料

TOP

好资料,工作中可以借鉴一下

TOP

太好了,谢谢,顶顶

TOP

一套不错的施工组织设计,向楼主学习

TOP

我顶顶顶顶顶顶顶

TOP

 43 1234
发新话题